We are getting our basement finished! We have been talking about doing this since we moved in 4 years ago but haven't gotten to far. Basically because of time and money. Since we are running out of room upstairs we decided that this is something that should get done this fall still before the baby comes and our whole upstairs gets taken over by baby and kid stuff. Mike has done small projects in the basement during these years but he has never had enough time to really get going at it. Plus we would need an egress window in the bedroom which he doesn't know how to do. Since we'd have to hire that part out anyways, we figured we'll just hire out all of the main things and get it done with! They are supposed to be starting tomorrow!!! Mike and David are still planning on doing the finishings like the paint, carpet, trim etc. to save on a little money and also give them some "fun" to do too.
Here are some before pictures of our basement. I'm going to try to update every day or two with new pictures.

This picture is looking out the doorway from the completed office. This will be the family room. Mike has mudded these walls already and installed the lights.
This will be Bennett's bedroom. This is off of the family room to the right. The egress window will be the one on the left side of the picture. Walls will be going up separating the furnace and bedroom and family room and bedroom.

This back area will be the bathroom and storage room. (My washer/dryer is cut off in this picture.) The bathroom will have a wall separating the laundry area and then another wall in the back separating the storage area. The bathroom will have a toilet, sink and shower.